Welcome to City of White Sulphur Springs White Sulphur Springs...A Great Place to Live!
In the City of White Sulphur Springs, we are defined less by boundaries on a map than by the sense of shared values our residents hold dear. Small town values, guided growth, preservation of historical, cultural, and natural heritage are just a few of the core principles that makes the City of White Sulphur Springs a wonderful place to call home.
***Public Notice ***
Driver's License
The first Wednesday of the month as well as the following added fridays:
April 22nd and 29th
May 13th and 27th
June 10th and 24th
July 8th and 22nd
August 12th and 26th
September 9th and 23rd
October 14th
**CALL FOR PROJECT QUOTES**
The City of WSS is calling for quotes to construct a retaining wall and install safety surfacing meeting the ASTM F1292, 2075, and F1951 standards in the use/fall zones at Bair Park, which is located on 4th Ave SE, approximately where it intersects with Wall St.
Project is broken into 2 parts:
Part 1: Retaining Wall:
- Excavate and construct a concrete retaining wall, approximately 60’ x 36”x 8”, which includes a 60’ x 14” x 8” footer. (Removed soil will be used to finish areas around the retaining wall and to level the fall/use zones.)
Part 2: Installation of Engineered Wood Fiber (“EWF”) in Use/Fall Zones:
- Identify use/fall zones as per the U.S. Consumer Product Safety Commission’s Public Playground Safety (“CPSC Manual”) at (https://www.cpsc.gov/s3fs-public/325.pdf)
- Excavate use/fall zones for below-ground installation of EWF as per the CPSC Manual (https://www.cpsc.gov/s3fs-public/325.pdf) and the EWF manufacturer’s instructions.
- If needed, install borders for fall zones.
- Install EWF as per manufacturer instructions (available at City Hall and online). As needed, contact Marks Lumber at (406) 933-5794 for further information.
- Place pea gravel in areas in between fall zones.
Please indicate which part(s) you are bidding. All parts may be bid on the same submission. A Notice of Request for Proposals and further important information is available at City Hall or online at whitesulphurspringsmontana.com. Join a site visit May 31, 2022 @ 4:00 pm or contact Carol Berg, Parks Advisory contact @ (406) 547-4783.
Quotes are due by 5:00 p.m. on June 15, 2022 at City Hall, 105 W. Hampton St - P.O. Box 442, White Sulphur Springs, MT 59645.
*To Check Standards, Specifications and Installation Instructions, Click on Government then Parks Advisory Important Documents*
It's July 2022 - Let's Celebrate!
July 01, 2022
We declare this month INDEPENDENCE MONTH!
Why should we limit our celebrations to only a day or long weekend? It’s time to break out the sparklers and pool floaties and fire up the grill to celebrate with family and friends in epic fashion!
Read the full article »
City of White Sulphur Springs
email is wss@itstriangle.com
Thank You.